Memorandum by All India Railway Trackmaintainers Union (AIRTU) and other railway unions

Every year, hundreds of railway workers die on duty. While unions have been continuously demanding workers’ safety, no concrete actions have been taken by the railway administration.
On 12 November 2026, Shri Agnivesh Modanwal, a gateman working in the Lakhimpur section of Lucknow Division, North Eastern Railway, lost his life after being hit by a goods train while on duty at 03:00. On 13 November, AIRTU and various unions of workers—including train managers (guards), loco pilots, pointsmen, and other categories—organized a condolence meeting and submitted a joint memorandum to the DRM, Lucknow Division.
By uniting across boundaries of category and union, railway workers have taken an important step to demand safe working conditions. The demands include:
- As per HOER rules, gatemen working at engineering level crossings in Lucknow Division have to work 60 hours a week. However, trackmaintainers working at gates across all three divisions of North Eastern Railway are being made to work 72 hours a week and 144 hours in 14 days. Overtime should be paid or a weekly double rest roster should be implemented.
- As per Indian Railways Permanent Way Manual (IRPWM), level crossings with a train vehicle unit (TVU) exceeding 50,000 are placed in the special category. As per the Railway Board, three gatemen should be appointed at such crossings. At such busy crossings, the duty shift should be reduced from 12 hours to 8 hours.
- Workers currently have patrolling beats of 16-20 km. In view of the increasing number of trains and their speed in current circumstances, employees are under tremendous mental and physical stress due to the heavy workload. Patrolling beats in North Eastern Railway should be fixed at 10-20 km, as has been done in zones such as Bilaspur and Jabalpur.
- Rakshak devices have not been provided in all divisions of North Eastern Railway. These devices should be made available immediately to prevent run-over cases.
The complete memorandum is provided below.
All India Railway Trackmaintainer Union
Letter No.: AIRTU/NER/GS/2026/019
Date: 13 November 2026
To,
The Divisional Railway Manager,
North Eastern Railway, Lucknow Division
Subject: Regarding ensuring the safety of all railway workers of Lucknow Division, implementing pending instructions issued by the administration, and preventing accidents
Sir,
The All India Railway Trackmaintainer Union (AIRTU) has continuously brought various burning issues and demands related to workers to the notice of the railway administration through memoranda from time to time. However, it is a matter of great regret that no concrete and effective action has been taken so far to resolve these issues. As a result, railway workers are continuously facing difficulties and inconveniences. Considering the safety and interests of all railway workers, the All India Railway Trackmaintainer Union (AIRTU) presents the following demands before you:
1. Sir, as per HOER Rule-2005, RBE No.-131/2005 Para 3 (III) and 4 (a) (ii) and 8 (ii), gatemen working at all engineering level crossings in the Lucknow Division of North Eastern Railway are required to work 60 hours a week. However, trackmaintainers working at gates across all three divisions of North Eastern Railway are being made to work 72 hours a week and 144 hours in 14 days. As per rules, gatemen should either be paid overtime for working more than 48 hours or 60 hours a week, or a weekly double rest roster should be implemented like other divisions.
2. Sir, as per Chapter No. 9 Para No. 209 of IRPWM, level crossings with a TVU exceeding 50,000 are placed in the special category, and as per Railway Board letter number 2012/E (LL)/HER/23 dated 28/06/2012, there is a provision to appoint three gatemen at such level crossings. Therefore, it is requested that making gatemen work continuously for 12 hours at heavy traffic gates with a TVU of more than 50,000 is inhuman. It is extremely necessary to reduce the duty shift to 8 hours at such places. We request that the duty duration at level crossings with a TVU of more than 50,000 in the Lucknow division of North Eastern Railway be reduced to 8 hours.
According to the guidelines issued by the Railway Board vide letter number: 2010/Sig/LX/2 dated 18-11-2024, it is mandatory to ensure interlocking arrangements at level crossing gates with more than 10,000 TVU (Track Vehicle Units).
3. Inform us about the current status and progress of interlocking work at all such eligible level crossing gates in the Lucknow Division of North Eastern Railway. At eligible gates where interlocking has not been done yet, interlocking work should be completed on a priority basis, and a report of the action taken in this regard should be provided to the union.
4. Sir, at level crossings (level gates) where basic facilities like electricity, clean drinking water, toilets, safety nets, and CCTV cameras are not yet available for workers, these facilities should be arranged immediately on a priority basis so that employees can get a safe, clean, and respectful working environment during duty, and their safety and health can be properly taken care of.
5. Sir, to ensure the protection and security of railway lines, the maximum distance of patrolling beats during winter, summer, and rainy seasons in North Eastern Railway should be fixed at 10 to 12 kilometers. In view of the increasing number of trains and their speed in current circumstances, fixing long patrolling beats of 16 to 20 kilometers is becoming extremely difficult and risky for employees. In addition, due to the heavy workload, continuous monitoring through GPS, and the pressure of completing patrolling within the fixed time limit, workers remain under physical and mental stress. In such situations, along with employee safety being affected, the risk of serious and tragic accidents like run-over also increases.
It is also worth noting that in other zones of Indian Railways, including Jabalpur and Bilaspur, the patrolling beat distance is kept at around 10 to 12 kilometers. Therefore, similar arrangements should be implemented in North Eastern Railway so that workers get an opportunity to discharge their responsibilities in safe and practical conditions.
Therefore, the union demands that giving top priority to railway security and the safety of workers’ lives, necessary orders to fix the maximum limit of all winter patrolling beats at 10 to 12 kilometers in the Lucknow Division of North Eastern Railway be issued immediately.
6. Sir, during winter patrolling, no worker should be put on patrolling duty continuously for more than a maximum of 7 days. After this, the concerned worker should be given mandatory weekly rest so that they get adequate physical and mental rest. Winter patrolling duty should be assigned again only after the rest period is fully completed.
7. Sir, the number of days or prescribed hours for which a worker is made to do night duty in a month must be paid the actual Night Duty Allowance as per rules in proportion to the actual night duty. No worker should be deprived of payment for the night duty performed by them, and night duty allowance should be paid based on hours, not days.
8. Sir, as per Railway Board Letter No.- 2017/Transfer cell/Civil/03/New Delhi, dated 05.02.18, paragraph 5.0, a Rakshak Safety Device was introduced to save trackmaintainers working on the track from run-overs. But still, Rakshak devices have not been provided in all divisions of North Eastern Railway. Sir, Rakshak devices should be made available immediately in all divisions so that trackmaintainers can be saved from run-overs.
9. Sir, a detailed analysis of the actual working conditions, workload, and duty arrangements of workers working in all sections of Lucknow Division (Duty Analysis) should be conducted. Along with this, the actual requirement and duty determination of workers should be done by surveying all level crossings (level gates) based on current TVU (Train Vehicle Unit), and union representatives should also be included in the duty analysis process so that the actual operational, workload, and safety requirements of workers can be clarified impartially and appropriate decisions can be taken in the interest of workers.
10. Sir, artisan staff (welders, carpenters, blacksmiths, and technicians) working under the Senior Divisional Engineer (Line), Lucknow, have not been paid their Uniform Allowance for the period from July 2017 to July 2021, due to which the concerned workers are facing financial losses.
Therefore, the union strongly requests that after verifying the relevant records and eligibility of the concerned workers, the pending uniform allowance (arrears) for the period from July 2017 to July 2021 should be paid to the said workers as soon as possible according to the rules, so that the workers can receive their long-pending financial benefits.
Sir, various burning issues and demands related to workers brought to the notice of the railway administration from time to time by the All India Railway Trackmaintainer Union (AIRTU) have not received any concrete and effective action for their resolution so far, which is very regrettable. As a result, railway workers are forced to face difficulties and inconveniences constantly.
Therefore, the union strongly demands that necessary action on all the points mentioned in this memorandum be ensured within 14 days, and written information about the action taken should be provided to the union.
If no concrete initiative is taken to resolve the issues within the stipulated 14-day time limit, the AIRTU will be forced to resort to democratic and constitutional methods like hunger strikes, indefinite hunger strikes, and agitations to protect the interests and rights of workers. The entire responsibility for this will lie with the railway administration.
Enclosures:
Copies of all Railway Board circulars and orders issued by the divisional office.
Yours faithfully,
(Ajay Kumar Saroj)
General Secretary
All India Railway Trackmaintainer Union
North Eastern Railway, Gorakhpur
Copy forwarded for information and necessary action to:
1. The Regional Labour Commissioner (Central), Kendriya Bhavan, Aliganj, Lucknow U.P. 226024
2. The Additional Divisional Railway Manager (Infra), Lucknow Division, North Eastern Railway
3. The Senior Divisional Personnel Officer, Lucknow Division, North Eastern Railway
4. The Senior Divisional Engineer (Coordination), Lucknow Division, North Eastern Railway
5. The National President and National General Secretary, AIRTU